Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Oct 06, 2022     Firewall components - (5 hours)       Category: Firewall
Relocated main bus that I'd previously installed on the cockpit side of the firewall .Turns out I mounted it where the right hand CD ignition box mounts. I will relocate it to the center panel side support near the main battery. Marked and drilled/deburred mounting holes for both ignition boxes. Still need to fabricate the mounting standoff for the ignition boxes. Fabricated and installed the diodes on the Master and Starter solenoids to prevent backflow of current when de-energizing the solenoids. Routed starter, master solenoid and alternator field wires thru firewall pass-through fitting. Also routed the GEA24 engine harnesses (EGT, CHT, Oil press/temp, man. press, fuel press) through the same firewall pass-through fitting.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.